Provincial Assembly of Sindh in its sitting held on Friday, the 24th October, 2014 has unanimously passed the following Resolution moved by Ms. Khairunisa Mughal, MPA, Ms. Saira Shahliani, MPA, Syeda Shehla Raza, Deputy Speaker, Provincial Assembly of Sindh, Dr. Sikander Mandhro, Minister for Parliamentary Affairs, Sindh, Syed Nasir Hussain Shah, MPA, Ms. Saniya, MPA, Ms. Iram Khalid, MPA, Ms. Nusrat Sultana, MPA, Dr. Sajeela Leghari, MPA, Ms. Ghazala Siyal, MPA, Ms. Kulsoom Akhtar Chandio, MPA, Mrs. Rukhsana Parveen, MPA, Ms. Rehana Leghari, MPA, Mr. Naeem Ahmed Kharal, MPA, Ms. Shehnaz Begum, MPA, Mr. Ghulam Qadir Chandio, MPA, Dr. Lal Chand Ukrani, MPA and Mrs. Shaheena, MPA:- RESOLUTION MOVED BY MS. KHAIRUNISA MUGHAL, MPA. “This Assembly pays tribute to Mohtarma Nusrat Bhutto Sahiba on her third Death Anniversary. She made sacrifices, which are unforgetable for the restoration of Democracy in the Country.”
RESOLUTION MOVED BY MS. SAIRA SHAHLIANI, MPA. “This House recommends and resolves to pay tribute to Begum Nusrat Bhutto Sahiba on her 3rd Death Anniversary as she was the big fighter of Democracy in our Country.”
Provincial Assembly of Sindh in its sitting held on Friday, the 24th October, 2014 has unanimously passed the following Resolution moved by Ms. Nusrat Bano Seher Abbasi, MPA, Dr. Muhammad Rafique Banbhan, MPA, Mr. Muhammad Dilawar Qureshi, MPA, Syed Muhammad Rashid Shah, MPA, Ms. Aisha Khatoon, MPA, Ms. Heer Soho, MPA, Syed Sardar Ahmed, MPA, Ms. Naheed Begum, MPA Ms. Shazia Jawaid, MPA and Ms. Rana Ansar, MPA:-
“This Assembly resolves that Provincial Government take steps to fill the vacant seats of Doctors, which are approximately 187, in district Tharparkar as early as possible to provide basic health facilities to the people of district Tharparkar.”
Provincial Assembly of Sindh in its sitting held on Friday, the 24th October, 2014 has unanimously passed the following Resolution moved by Ms. Heer Soho, MPA, Mr. Muhammad Saleem Rajput, MPA, Syed Khalid Ahmed, MPA, Sardar Muhammad Bux Khan Mahar, MPA, Syed Nasir Hussain Shah, MPA, Mr. Muhammad Hussain Khan, MPA, Ms. Naheed Begum, MPA, Ms. Rana Ansar, MPA and Mr. Ahmed Ali Khan Pitafi, MPA:-
“This Assembly resolves and recommends to the Government of Sindh to approach the Federal Government to take measures to stop poisonous water entering from Punjab industry because land of District Ghotki and Sukkur, Taluka Salehpat are being affected.”
Provincial Assembly of Sindh in its sitting held on Friday, the 24th October, 2014 has unanimously passed the following Resolution moved by Dr. Sikandar Shoro, MPA and Dr. Sikander Mandhro, Minister for Parliamentary Affairs, Sindh:-
“This Assembly resolves to show the importance and our commitment on WORLD POLIO DAY. World Polio Day being observed around the World, provide an oppurtunity to join the Polio eradication community to renew our promises of a Polio free world. It is moral and religious obligation on parents and community that all children upto 5 years of age receive Polio drops every time these are offered. We have to save our children from crippled future. I have this oppurtunity to pay tribute to our “Polio Heroes” the people who rendered their lives and embraced shahdat for the noble cause of Polio eradication.”
PROVINCIAL ASSEMBLY OF SINDH
PUBLIC HEALTH ENGINEERING DEPARTMENT
LIST OF STARRED ASSEMBLY QUESTIONS AND ANSWERS FOR
FRIDAY THE 24TH OCTOBER, 2014.
*10. MS. NUSRAT SEHER ABBASI: Will the Minister for Public Health Engineering be pleased to state:-
(a) Is it a fact that water supply and drainage schemes are either closed or extremely in deplorable condition due to improper maintenance in all talukas of district Khairpur;
(b) If answer to (a) above be in the affirmative, the details thereof alongwith the measures taken in this regard?
ANSWER
SYED QAIM ALI SHAH JILLANI, (Chief Minister) Minister for Public Health Engineering:
(a) The Urban Water Supply & Drainage Schemes of all Talukas of District Khairpur are being maintained by concerned Local councils and are functional but only Khairpur City is being maintained by NSUSC which is also functional.
(b) The major Water Supply & Drainage Schemes in rural areas are functional. However, some schemes are non functional for various reasons and needs major repair/extension (the list functional and non-functional schemes is at Annexure, placed on the table of the House). In this regard an amount of Rs. 1.00 billion have been allocated in the Budget during 2013-14 for Rehabilitation of Non-functional Schemes. The work will be started shortly after completing codal formalities.
*380. MS. NUSRAT SEHER ABBASI: Will the Minister for Public Health Engineering be pleased to state:-
(a) Is it a fact that a scheme “Urban Drainage Scheme” worth 58 crore rupees was approved in district Dadu but the same has not been completed;
(b) If answer to (a) above be in the affirmative, the reasons thereof along with the present status of the same?
ANSWER
SYED QAIM ALI SHAH JILLANI, (Chief Minister) Minister for Public Health Engineering:
(a) The Improvement/extension of Urban Drainage Scheme Dadu City costing Rs. 589.7 (M) was approved during the year 2008-2009 and it was to be completed in 2011. Due to insufficient and slow release of funds it has not yet been completed.
(b) The major components of the scheme are not completed as yet due to slow and insufficient funding.
Details of scheme is as under:-
(i) Present status of the scheme given below:-
PRESENT STATUS OF THE COMPONENTS FOR IMPROVEMENT
/EXTENSION OF DRAINAGE SCHEME DADU
S. No.
|
Item
|
Provision in the PC-I
|
Expenditure upto 06/2013
|
Liabilities /Work in Hand
|
Total
|
1.
|
Surface Drains i/c C.C Block
|
86810665
|
76548108
|
17046521
|
93594629
|
2.
|
R.C.C Nala
|
189404800
|
82979033
|
121425767
|
204404800
|
3.
|
Disposal Work i/c P/House & C/Wall
|
55188740
|
2254728
|
62934012
|
65188740
|
4.
|
Pumping Machinery
|
36734000
|
1300000
|
42934000
|
44234000
|
5.
|
Rising Main
|
74045850
|
0
|
84838936
|
84838936
|
6.
|
Railway Crossing
|
1000000
|
0
|
1000000
|
1000000
|
7.
|
Oxidation Pond
|
23748442
|
0
|
23748442
|
23748442
|
8.
|
Power Connection
|
4500000
|
1307000
|
3193000
|
4500000
|
9.
|
Land Acquisition
|
39675000
|
577500
|
39097500
|
39675000
|
10.
|
Land Development
|
180000
|
0
|
180000
|
180000
|
11.
|
Physical Contingencies
|
10225750
|
1033631
|
9192119
|
10225750
|
12.
|
Price Contingency
|
50053900
|
0
|
0
|
0
|
13.
|
O.M Cost
|
12271318
|
0
|
12271318
|
12271318
|
14.
|
1% T.P.V
|
5838385
|
0
|
5838385
|
5838385
|
Total
|
589676850
|
166000000
|
423700000
|
589700000
|
(ii) Breakup of year wise release & expenditure given below:-
YEAR-WISE FINANCIAL POSITION OF IMPROVEMENT & EXTENSION OF
URBAN DRAINAGE SCHEME DADU CITY
S. No
|
Financial Year
|
Provision as per PC-I
|
Allocation
|
Funds Released
|
Expenditure year wise
|
Commulative Expenditure
|
1.
|
2008-09
|
30.100
|
50.000
|
50.000
|
50.000
|
50.000
|
2.
|
2009-10
|
211.000
|
40.000
|
40.000
|
40.000
|
90.000
|
3.
|
2010-11
|
348.600
|
24.000
|
24.000
|
24.000
|
114.000
|
4.
|
2011-12
|
0.000
|
12.000
|
12.000
|
12.000
|
126.000
|
5.
|
2012-13
|
0.000
|
40.000
|
40.000
|
40.000
|
166.000
|
6.
|
2013-14
|
0.000
|
50.000
|
12.500
|
0.000
|
166.000
|
Total
|
589.700
|
216.000
|
178.500
|
166.000
|
712.000
|
*526. MS. NUSRAT SEHER ABBASI: Will the Minister for Public Health Engineering be pleased to state:-
(a) Is it a fact that water supply scheme of Berani town started in 2007 but could not be completed as yet due to inefficiency of TMA resulting citizens are in trouble;
(b) If answer to (a) above be in the affirmative, the reasons thereof?
ANSWER
SYED QAIM ALI SHAH JILLANI, (Chief Minister) Minister for Public Health Engineering:
Improvement and Extension of Urban Water Supply Scheme Berani was approved for Rs.159.757 million during the year 2008-09. The scheme was scheduled to complete within 03 years i.e. 2010-11. However, it could not be completed due to short releases. The year-wise breakup of release and expenditure is as under:-
S. No.
|
Year
|
Release
|
Expenditure
|
1.
|
2008-09
|
15.00 million
|
15.00 million
|
2.
|
2009-10
|
45.00 million
|
45.00 million
|
3.
|
2010-11
|
7.50 million
|
7.50 million
|
4.
|
2011-12
|
15.00 million
|
15.00 million
|
5.
|
2012-13
|
30.00 million
|
30.00 million
|
6.
|
2013-14
|
6.25 million
|
6.25 million
|
Total
|
118.75 million
|
118.75 million
|
The status of the scheme is as under:-
STATUS OF IMPROVEMENT AND EXTENSIONS OF URBAN WATER
SUPPLY SCHEME BERANI
1. A.A Cost
|
Rs. 159.757 Million
|
|
2. Date of Start as per PC-I
|
2008-09
|
|
3. Date of Completion as per PC-I
|
2010-11
|
|
4. Expenditure up to 15.09.2013
|
Rs. 118.750 Million
|
|
S. No.
|
Main Components
|
Progress in % Age
|
1.
|
M.S Black Steel pipe 12” dia 25000 Rft.
|
95%
|
2.
|
Compound Wall 1488.0 Rft.
|
80%
|
3.
|
Pumping Machinery 10, 15 & 30 BHP (07 Sets)
|
90%
|
4.
|
Distribution PVC pipe 3”, 4”, 6” & 10” dia 27540.0 Rft.
|
70%
|
5.
|
Land Acquisition 5.0 Acres
|
100%
|
6.
|
Storage Tank 1825 MGD 4.0 Nos.
|
95%
|
7.
|
Filter Bed
|
95%
|
8.
|
Clear Water Tanks
|
40%
|
|
|
|
|
|
*871. DR. MUHAMMAD RAFIQUE BANBHAN: Will the Minister for Public Health Engineering be pleased to state:-
(a) Is it a fact that the filter plants were installed in district Khairpur during 2009 to 2013;
(b) If answer to (a) above is affirmative, the details thereof?
ANSWER
SYED QAIM ALI SHAH JILLANI, (Chief Minister) Minister for Public Health Engineering:
The various Programme Water Filter Plants were installed in District Khairpur by Public Health Engineering Department in Sindh during 2009 to 2013.
(1) The details proposed, Ultra Filtration Plants in District Khairpur during the period under Clean Drinking Water for all Project (Packet-5) is at Annexure-I.
(2) The details of Reverse Osmosis Plants Installed in District Khairpur during the period under Clean Drinking Water for all Project (Packet-78) is at Annexure-II.
(3) The details of Reverse Osmosis Plants Installed in district Khairpur during the period under Rain Emergency Programme 2011 is at Annexure-III.